Relocation within a laboratory
We review the route to the new position and coordinate the timing with the facility contact, according to the preparation required for the unit.
LOGISTICS FOR YOUR EQUIPMENT
An ultra-low temperature (ULT) freezer move starts by confirming how the unit will be prepared. We coordinate collection, handling and destination positioning with your technical lead, taking account of the freezer’s dimensions and its route through the laboratory. Any contents requiring preservation must be identified in the enquiry and covered by a specifically confirmed scope.

We review the route to the new position and coordinate the timing with the facility contact, according to the preparation required for the unit.
We agree collection and receiving arrangements with both facilities. Dimensions, access and technical preparation requirements are confirmed before transport.
We define where the freezer needs to be placed. If another unit is to be collected, its preparation and destination are also agreed. Each movement is identified in the scope.
What we can do
We confirm who prepares the unit, which instructions apply and when it will be ready to move. Preparation and restart timing and conditions are agreed with your technical lead.
We assess external dimensions, weight and the route: doors, lifts, turns and access to the final position.
We define the logistics resources and protection for the unit and the planned route. Receiving arrangements are coordinated with the nominated destination contact.
Service scope. This page describes moving the unit. Sample transport and temperature control require a specific scope confirmed before booking; they are not automatically included. Preparation and restart are coordinated with your technical lead.
PREPARATION, ACCESS AND NEW POSITION
The unit’s condition at collection is part of the plan. Tell us about any contents so preservation requirements are not left to assumption.
Preparation should follow the instructions for the model and your technical lead’s guidance. This needs to be confirmed before the service; we do not give a universal disconnection or restart procedure.
Tell us in the enquiry. Moving the unit does not automatically include preserving its contents. Any sample transport or temperature control requires a specific scope confirmed before booking.
A freezer’s operating temperature is not a guarantee of temperature during movement. No thermal conditions should be assumed unless expressly confirmed in the service scope.
Yes. We also assess internal moves, reviewing preparation, weight, dimensions and the entire route to the new position.