Skip to content

T2I LOGISTICS

LOGISTICS FOR YOUR EQUIPMENT

Ultra-low freezer relocation

An ultra-low temperature (ULT) freezer move starts by confirming how the unit will be prepared. We coordinate collection, handling and destination positioning with your technical lead, taking account of the freezer’s dimensions and its route through the laboratory. Any contents requiring preservation must be identified in the enquiry and covered by a specifically confirmed scope.

Conceptual illustration of an upright ultra-low laboratory freezer against a dark background
Conceptual illustration of this equipment category.

A relocation that starts with preparation

01

Relocation within a laboratory

We review the route to the new position and coordinate the timing with the facility contact, according to the preparation required for the unit.

02

Moving between facilities

We agree collection and receiving arrangements with both facilities. Dimensions, access and technical preparation requirements are confirmed before transport.

03

Delivery or replacement of a unit

We define where the freezer needs to be placed. If another unit is to be collected, its preparation and destination are also agreed. Each movement is identified in the scope.

What we can do

Agreed preparation and movement of the unit

Preparation with the technical lead

We confirm who prepares the unit, which instructions apply and when it will be ready to move. Preparation and restart timing and conditions are agreed with your technical lead.

Dimensions and access route

We assess external dimensions, weight and the route: doors, lifts, turns and access to the final position.

Protection, transport and positioning

We define the logistics resources and protection for the unit and the planned route. Receiving arrangements are coordinated with the nominated destination contact.

Service scope. This page describes moving the unit. Sample transport and temperature control require a specific scope confirmed before booking; they are not automatically included. Preparation and restart are coordinated with your technical lead.

PREPARATION, ACCESS AND NEW POSITION

Let’s define how the unit will be ready for collection

The unit’s condition at collection is part of the plan. Tell us about any contents so preservation requirements are not left to assumption.

  • 01Freezer model, external dimensions, weight and photos.
  • 02Collection point, destination, final position and measurements of any access constraints.
  • 03Technical lead, applicable instructions and intended preparation for the move.
  • 04Dates and status of the contents: tell us if any materials require preservation.

The unit, its contents and the move requirements

Does the freezer need to be disconnected or prepared before moving?

Preparation should follow the instructions for the model and your technical lead’s guidance. This needs to be confirmed before the service; we do not give a universal disconnection or restart procedure.

What if there are samples inside?

Tell us in the enquiry. Moving the unit does not automatically include preserving its contents. Any sample transport or temperature control requires a specific scope confirmed before booking.

Is the operating temperature maintained during the move?

A freezer’s operating temperature is not a guarantee of temperature during movement. No thermal conditions should be assumed unless expressly confirmed in the service scope.

Can you move it within the same building?

Yes. We also assess internal moves, reviewing preparation, weight, dimensions and the entire route to the new position.

YOUR EQUIPMENT ENQUIRY

Tell us what needs moving.

Fill in these details and we will reply within 24 working hours.

We only use these details to answer your enquiry. Please avoid patient data or unnecessary personal information.