Skip to content

T2I LOGISTICS

LOGISTICS FOR YOUR EQUIPMENT

Laboratory equipment relocation

Moving laboratory instruments starts with knowing what is leaving, which items travel together and where each instrument will be received. We plan the inventory, packing and movement sequence with laboratory contacts. From a single instrument to a phased relocation, logistics are coordinated with the planned technical work.

Conceptual illustration of analytical instruments and an autosampler against a dark background
Conceptual illustration of this equipment category.

From one instrument to a phased relocation

01

An instrument changing location

A new delivery or a move between laboratories is planned around the instrument, its associated items and the destination space.

02

Several instruments in different phases

We group movements around the equipment and dates you define. Each phase has a package list, delivery point and receiving contacts.

03

Logistics linked to technical work

We agree when the instrument will be ready for collection and when the engineer needs to receive it. The plan distinguishes transport, positioning and technical work.

What we can do

Inventory, protection and delivery order

An inventory for the move

We list the instruments, associated components and packages included. Each item is linked to its collection point and destination position.

Packing for each instrument

We review the available packaging and preparation instructions to define protection and handling. The work is agreed with you before collection.

Sequence and receiving arrangements

We coordinate movements with the laboratory and engineers. For staged deliveries, the equipment, access and receiving arrangements are agreed for each phase.

Service scope. The scope described is equipment relocation. Technical preparation, installation, calibration and commissioning remain with the responsible engineers. Samples, reagents or other materials require a specific confirmed scope and are not automatically included.

EQUIPMENT, PHASES AND POSITIONS

Let’s start with your equipment list

You can start with your instrument list. We use it to identify missing details and define the collection and delivery stages.

  • 01List of instruments and models, with associated components and packages.
  • 02Weight and dimensions of each unit and available packaging.
  • 03Collection point, destination for each instrument and laboratory access.
  • 04Intended phases or dates, technical contacts and equipment preparation status.

Organising your laboratory move

Can you move just one instrument?

Yes. We also plan individual instrument moves. The model, components, dimensions and site access allow us to define the service.

How is a phased laboratory move organised?

We start with the equipment for each phase, its destinations and the dates the facility is considering. We agree the sequence and receiving contacts, coordinated with the engineers’ work.

Is packing part of the service?

It can be included when defined in the proposal. We review the instrument type, available packaging and applicable instructions before agreeing the protection required.

Do you also move cabinets and ultra-low freezers?

Yes. We assess these categories separately because of their configuration, dimensions and preparation needs. You can consult their pages and include the details in the same relocation enquiry.

YOUR EQUIPMENT ENQUIRY

Tell us what needs moving.

Fill in these details and we will reply within 24 working hours.

We only use these details to answer your enquiry. Please avoid patient data or unnecessary personal information.