Moving within a facility
We review the route to the new room and the configuration in which the equipment can move. The facility contact and engineers define its preparation.
LOGISTICS FOR YOUR EQUIPMENT
X-ray equipment may need a new room, a move between facilities or collection for an already defined destination. We plan logistics around the model and configuration, coordinating preparation with the technical service team and delivery to the agreed position with the facility.

We review the route to the new room and the configuration in which the equipment can move. The facility contact and engineers define its preparation.
We agree which components travel, where they are collected and who receives them. Protection and logistics resources are planned for the equipment and site access.
Collection requires a defined destination and receiving contact. When equipment is being replaced, we coordinate outgoing and incoming movements within the agreed scope.
What we can do
We identify the model, components and technical instructions for movement. The plan is adapted to the configuration of each system.
We coordinate locations, dates and contacts, review the route and define protection, handling and the intended final position.
For a removal request, we agree the logistics collection, destination and receiving arrangements. Technical deinstallation and any subsequent handling need clearly defined responsibilities.
Service scope. Disconnection, technical deinstallation, calibration and commissioning remain with the appropriate specialists. A logistics collection does not itself include recycling, waste management or equipment-related regulatory procedures.
CONFIGURATION, PREPARATION AND DESTINATION
The model and destination help define the operation. If the equipment is leaving the facility permanently, tell us who will receive it and the scope required for collection.
We can assess collection when the destination and receiving contact are defined. We also need the equipment preparation status and access details for its removal from the facility.
Technical deinstallation should be coordinated with the appropriate specialists. Any physical dismantling must be expressly defined in the proposal; it is not automatically included in collection.
We review each request by model, components, weight, dimensions and preparation. This equipment category does not replace an assessment of the specific unit and its access requirements.
Delivery ends at the agreed logistics position. Connections, checks, calibration and any required authorisation for use remain with the appropriate professionals.